Monitor your freight in real time
Track location, temperature, statuses and journey events from a single platform, so you can get ahead of deviations, react faster and back every shipment with complete traceability.
Monitoring for refrigerated and ambient freight
Location, temperature and status in real time
Alerts and history per journey
Every critical variable of your freight, in a single flow
Location in
real time
Temperature and
condition
Journey status
and milestones
Alerts or
deviations
History and
evidence
When freight loses visibility, the operation loses its ability to react
Traceability is not just about knowing where a vehicle is. It is about having timely information on the location, condition, progress and incidents of a shipment so you can decide before the problem hits the customer, the product or your operational compliance.
Incomplete visibility of the journey
When information arrives late or depends on manual reports, the operation is left with stretches where nobody really controls what is happening en route.
Deviations spotted too late
Delays, route changes or unreported stops tend to surface once the damage is done and there is barely any room to react.
No control over condition
With sensitive freight, confirming delivery is not enough. You need to know whether temperature and transport conditions stayed within the expected ranges.
Incidents with no clear evidence
Faced with damage, delays or claims, many operations lack the evidence to understand what happened, when it happened and where the incident originated.
Information scattered across teams
Emails, spreadsheets, calls and messages make it hard to hold a single view of the shipment, causing rework and decisions based on partial information.
Reports that are hard to back up
Without a traceable journey history, responding to audits, claims or quality requirements becomes slow, manual and unreliable.
Turn every shipment into an operation that is visible, controlled and evidenced
It is not just about knowing where the freight is. It is about having the control to make better decisions at every stage of the journey
Operational visibility
Location, progress and ETA in a single view, so you know what is happening en route and depend less on manual reports.
Freight condition
Temperature and critical variables monitored throughout the journey, to catch deviations before they affect the product.
Exceptions en route
Alerts for deviations, stops or out-of-range events, so you can act in time and stop the problem escalating.
Journey evidence
History, events and shipment evidence available to review, audit and support claims or compliance.
Less uncertainty. More control. Better evidence.
A platform built for operations where every shipment has to be visible, traceable and verifiable.
Logistics teams
already operating with full visibility
The whole journey, laid out in a single view
Druppify brings together the key information from every shipment so your team can monitor, prioritise and respond with more clarity during the operation.
Prioritise what matters
Quickly spot which journeys are running to plan and which need immediate attention.
Respond with context
Access the shipment status, its condition and the associated events without relying on calls, messages or spreadsheets.
Coordinate the operation better
Give logistics, operations and supervision the same single source of information, so everyone acts in step.
Cut manual follow-up
Bring into one view what used to be checked across separate reports, channels and scattered queries.
Back every shipment
Keep journey traceability, an event log and evidence on hand for review, audit or claims.
One solution across both refrigerated
and ambient freight
Our platform adapts to the operational demands of your fleet, ensuring visibility and full control in any condition.
Refrigerated freight
-
Continuous monitoring of temperature for strict cold chain compliance.
-
Immediate alerts on any critical temperature deviation during the journey.
-
Certified history available for quality audits and health and safety evidence.
Ambient freight
-
Extended visibility along the entire route, with live ETA reporting.
-
Event control through early detection and operational statuses.
-
Greater control that secures successful deliveries and simplifies exceptions.
Full control for every scenario
Refrigerated transport
Strict control of temperature, route and events to protect the cold chain with no interruptions and no surprises.
Food distribution
Monitor deliveries that are highly sensitive to time and product condition, cutting incidents on arrival.
Pharmaceutical logistics
Ensure traceability and keep an unalterable journey history for operations under strict health regulations.
Sensitive freight
Detect tampering, abnormal stops and changes in condition that could lead to spoilage or fraud.
Operations with demanding SLAs
Identify delays and exceptions instantly, gathering visual and telematic evidence in real time.
Audited transport
Centralise the logistics history transparently, so incidents can be analysed on the basis of digital evidence.
Tackle the most complex challenges from a single view. Every scenario comes with interactive evidence.
Take control of your freight
Leave us your details and we will show you how smart traceability transforms your shipments.